30x100x16 Metal building

From US$ 60,480.00

A red iron metal building offers an energy-efficient solution. It is designed with materials engineered to endure even the most challenging environmental conditions.

Our 30 x 100 x 16 metal building kit features one large 10’x14’ overhead door and a standard 3'x7' (3070) personnel door. You can adjust the number, size, and placement of these to meet your storage and access requirements.

With 3,000 square feet of clear-span space and a 14-foot door clearance, this building is ideally suited for Heavy metal machinery storage, RV repair garage, or warehouse.

Let us help you find the best building at the right price. Get competing estimates from four reputable suppliers. We’ve done the heavy lifting so you can compare prices quickly and easily.

Overhead Doors
10'w x 10'h
10'w x 10'h
US$ 1,494.00
-
+
16'w x 12'h
16'w x 12'h
US$ 2,598.00
-
+
Wall Color
Roof Color
Trim Color
Windows
4' x 3' Insulated Horizontal Slide
4' x 3' Insulated Horizontal Slide
US$ 176.00
-
+
Personnel Doors
3' x 7' Full Panel Walk Door
3' x 7' Full Panel Walk Door
US$ 563.00
-
+

Get Estimates3D Customize

SKU: BGSZ5028 Width: 30' Length: 40' Height: 16' Category:

* Price is for the shell only, varies by location & doesn't include foundation, installation, or interior walls

Metal building kit features

Start your project by customizing a base metal building kit or pole building package to create a structure that accommodates your equipment, along with access, clearance, and interior storage space needs.

Customize the height, roof style (and pitch), color, door, and windows to create a unique building that reflects your chosen aesthetic.

  • What's included

    30 x 100 x 16 Kit packages include:

    • Steel I-Beam framing
    • Steel roof & wall panels (26ga)
    • Complete trim package
    • Two framed door openings
    • Foundation anchor bolt plans
    • Engineer stamped plans
    • Building kit delivery
    • Installation instructions
    • All bolts, flashing & sealants

    Framing for Pre-Engineered Metal Building
    I-beam steel framing
  • Features

    Steel building features:

    • Bolt-up construction
    • Trussless roof design
    • Clearspan widths to 300'
    • Certified to 160 mph wind
    • Certified to 110 psf snow
    • 30+ year warranty
    • Fast, free delivery
    • Fast build time

  • Customization

    Metal building custom options:

    Doors - Choose overhead garage door, rollup, sliding or bifold doors.

    Roof profile & pitch - Adjust the gable roof pitch or select a single-slope, gambrel, or monitor profile

    Insulation - Opt for vinyl-faced fiberglass, spray foam, or insulated metal panels (IMPs).

    Structural upgrades - Add porches, metal garage, oversized garage, overhangs, a carports lean-to, or a mezzanine for loft storage.

  • Specifications

    Specs for our 30x100 metal buildings:

    • Wind load: 70-160 mph
    • Ground snow load: 10-110 psf
    • Roof pitches: 1, 2, 3, 4, & 5:12
    • Roof styles: Gable, single slope, lean-to
    • Bay spacing: 20', 25' and 30'
    • Widths: 30' to 300' (clear span)
    • Heights: 10' to 40' (eave height)
    • Primary framing: Steel I-beams
    • Second framing: steel purlins & girts
    • PBR metal wall & roof panels: 24 or 26 ga.

  • Exclusions

    Items not covered in out steel buildings:

    • Permits
    • Foundation
    • Installation
    • Insulation
    • Interior build out

Get Four Quotes

Compare prices from local suppliers and save
Get Prices

Frequently asked questions

  • Do I need a building permit?

    Yes, in most cases, especially within city limits. Some jurisdictions and properties on farmland can be exempt. Be sure to verify for your chosen job site.

    Some key points to consider:

    • First, ensure your plans comply with zoning ordinances, then apply for a building permit. Larger buildings or those with more occupants face stricter regulations.
    • Submit certified plans: building officials require third-party certified plans for the form, structure and foundation. A reputable manufacturer should provide these.
    • Understand zoning: determine if your site is zoned commercial or residential and understand specific requirements and building price.
    • Plan for permit processing: The permit application process can be lengthy.
    • Prepare an official site plan: a licensed surveyor or structural engineer should design an official site plan necessary for the permit applications.
    • Keep permits on-site: once you have the necessary permits, keep them at the job site ready for any required inspections.
    • Adhere to approved plans: inspectors will reference the certified blueprints throughout construction. If design changes occur, submit new certified plans and apply for new permits to avoid delays and fines.

  • What are my options for installation?

    When it comes to erecting your garage building, you have three options.

    • Do-it-yourself (DIY). We only advise going this route on smaller buildings things such as storage sheds and carports (under 2,000 square feet), and if you have previous construction experience.
    • Self-manage. With a self-managed outline, you are responsible for hiring and managing the various sub-trades, including the concrete company for the foundation, the steel erectors to construct the kits, plumbers, electricians, etc.
    • Hire a General Contractor (GC). For a completely hands-off option, you may want to consider hiring a GC who will manage the entire design on your behalf, from pulling permits and installation to the final inspection. Expect the pricing up to10-20% for the services of a GC.

  • Why are your buildings more expensive than other options I have seen online?

    Our suppliers sell only commercial-grade, pre-engineered metal buildings (PEMBs) engineered with solid steel I-beam framing. The majority of buildings you will have seen online are light-steel gauge tubular metal buildings. The difference in building pricing is due to steel tubular structures weighing less than half of a PEMB, impacting the overall price and starting price as steel is sold by weight. It’s a classic case of apples n’ oranges!

  • What financing options are available for metal buildings?

    Here are the most common options for financing a new building.

    • Consider home improvement loans for smaller like workshop garage, detached garage, carport, storage shed or pottery shops.
    • Home Equity Line of Credit (HELOC) is more flexible and has competitive and rates, but you must use your home as collateral.
    • Construction loans are ideal for larger residential and commercial plans.
    • Farm credit for agricultural and farm building projects is the final option.

  • Why must doors and windows be 2' from corners and the roof eave?

    Maintaining a 2-foot distance from the corners and the eave of a steel building's roofline ensures structural integrity, safety, compliance with building codes, and practical construction considerations.

    • Support and stability: installed corners provide critical support, and keeping framed openings away from corners guarantees stability.
    • Load distribution: a two-foot distance also ensures even load distribution, preventing structural issues.
    • Foundation stability: this prevents compromising the foundation and framing during high wind or snow loading.
    • Ease of construction: Simplifies the installation of door and windows
    • Insulation and energy efficiency: the corner and eave areas are critical for the building's thermal envelope. Keeping openings away from these areas allows continuous insulation in these high-heat-loss areas. It also prevents thermal bridging at structural connections, improving the building's overall energy performance.
    • Weather protection: placing openings away from corners helps prevent water from seeping in and allows for sound flashing installation around openings, reducing exposure to wind-driven rain in vulnerable corner/eave areas.
    • Clearance for framing: a minimum 2-foot clearance allows room to frame and support the door or window opening correctly. This space is needed to fit wall girts between the corner column and door/window jamb.

    Our manufacturers often recommend adding 8-10 inches to the minimum 2-foot distance for buildings with bypass sidewalls to account for the bypass girt depth.

Have a question? We're here to help.

Why choose us?

BuildingsGuide simplifies the process of finding reputable suppliers of prefab metal buildings, allowing you to select the ideal vendor for your needs and budget.

Since 2004, over 200K buyers have saved an average of 28% on their project with our multiple quote service.

Proudly serving customers in the United States & Canada for over 20 years.

Compare & save!

Let us help you find the best deal on a metal building for sale.

  • Tell us about your project
  • We match you with vetted suppliers
  • You receive four competing quotes
  • Select the most suitable supplier
  • Start your project